Skip to main content
San Francisco Bay Area, California

San Francisco construction projects, live from the Bay Area permit feed.

56,000+ active projects across San Francisco, Oakland, San Jose, and the peninsula — including the Mission, SoMa, Mission Bay, Oakland's Jack London Square, and the South Bay tech corridor. Data live from SF DBI and every Bay Area AHJ.

56,240

Active projects in San Francisco

4,820

Permits issued in the last 30 days

284

Commercial $1M+ permits this month

Market snapshot

What's actually happening in Bay Area construction in 2026

The San Francisco Bay Area is a multi-AHJ patchwork: SF DBI in the city, Oakland in the East Bay, San Jose in the South Bay, plus a dozen peninsula jurisdictions (San Mateo, Palo Alto, Mountain View, Sunnyvale, Redwood City) and Marin / Sonoma to the north. "Bay Area" on a sales pipeline is functionally five sub-markets — peninsula tech, San Francisco urban, Oakland / East Bay, South Bay tech, and the North Bay coastal corridor.

What's changing in 2026: life-sciences fitout remains the strongest single signal across the peninsula and South SF. Multifamily ground-up is picking up in Mission, SoMa, Oakland Jack London, and along the peninsula on transit-adjacent parcels. Tech office TI is volatile — large blocks coming back to the market drive heavy reconfiguration permits, but ground-up office has cooled. Seismic retrofit work continues to be a steady drumbeat thanks to soft-story ordinances in SF and Oakland.

The BD teams winning in the Bay Area are the ones who treat the peninsula as a distinct sub-market from SF proper. The trade-contractor networks, the bonding partners, the architect roster — they're separate ecosystems. Trying to cover the entire region with one filter set surfaces noise. Picking a sub-market (peninsula tech, SF urban, or East Bay multifamily) and going deep is the operating pattern of the firms scaling fastest.

Trade mix

Where the permitted value sits in SF

Trade mix across the SF Bay Area over the last 12 months, weighted by permitted value above $1M.

Tech office + life-sciences

21%

1,840 active

Life-sciences fitout in Mission Bay, South SF, and the peninsula remains the strongest single trade.

Multifamily ground-up

19%

6,420 active

Mission, SoMa, Oakland Jack London, and the peninsula all permitting actively in the $10M+ band.

Tenant improvement (commercial)

16%

9,840 active

Office reshuffling continues to drive heavy TI volume; restaurant + retail buildouts secondary.

Healthcare + medical office

13%

2,140 active

UCSF, Stanford, Kaiser, and Sutter expansions remain the dominant healthcare backbone.

Seismic retrofit + envelope

9%

1,320 active

Soft-story ordinances and façade refresh keep envelope work consistently busy.

Single-family + ADU

6%

8,940 active

ADU permitting is a major volume bucket; average ticket smaller than LA equivalents.

Pursuit playbook

The Bay Area pursuit playbook

How the top construction BD teams in the Bay Area operate in 2026.

  1. 1

    Pick a sub-market and go deep

    Peninsula life-sciences, SF multifamily, Oakland East Bay, South Bay tech. Each is a distinct ecosystem with its own AHJ set, GC roster, and bonding partners. The teams scaling fastest cover one sub-market deeply rather than chasing the entire Bay Area thinly.

  2. 2

    Track the master site permit, not the lot

    On tract or campus work — peninsula life-sciences in particular — the master site permit issues months before any individual lot permits. That's your outreach window. The lot permits are confirmation, not the trigger.

  3. 3

    Watch CEQA filings + planning agendas

    Bay Area entitlement work is heavy. CEQA notices, planning-commission agendas, and design-review hearings often surface a project 6–9 months before any building permit issues. If you sell into the early stages, those filings are the canonical feed.

  4. 4

    Profile the architect, not just the GC

    Architects drive a lot of Bay Area sub-trade selection — particularly on life-sciences and tech-office work. Knowing which firms a particular architect specs with, and which mechanical engineers they typically pair with, shortens the path to the M&E bid invite.

  5. 5

    Watch the soft-story + envelope drumbeat

    Seismic retrofit and envelope work is a consistent revenue base for specialty trades. The signal is the soft-story ordinance compliance filing; the conversion is the structural + envelope contractor selection roughly 60–90 days later.

FAQ

San Francisco construction FAQ

  • Full Bay Area. The feed includes SF, Oakland, San Jose, every peninsula city (San Mateo, Palo Alto, Mountain View, Sunnyvale, Redwood City), Marin and Sonoma counties, plus the East Bay (Berkeley, Walnut Creek, Fremont).

See the Bay Area on the live map.

30 minutes with a founder. We pull up your sub-market — peninsula, SF, Oakland, or South Bay — and ship a workspace the same day if it's a fit.