Skip to main content

Electrical use case

Tibly for commercial electrical contractors.

Every electrical permit, service-upgrade, and commercial buildout across Florida, California, Texas, and Illinois — surfaced from permits, planning agendas, and contractor registries. EV charging, data-center fitouts, and industrial process loads included.

Commercial electrical panel rough-in inside a building under construction with neatly bundled red, blue, yellow, and black wires entering a breaker panel and an electrician in a hard hat torquing a breaker
Why electrical teams switch

Walk into the bid call already on the team list.

What changes in the first month for a commercial electrical sales team.

Statewide

Permit-rich markets across CA, TX, FL, and IL

234k+

Active electrical-eligible projects in the feed

9 stages

From entitlement to TCO — never miss a window

What you get

Built for the way commercial electrical BD actually works.

Service work, TI rough-in, ground-up commercial, EV charging infrastructure, and data-center fitouts each have a different signal — Tibly merges them into one workspace.

Coverage

Electrical-tagged permit feed

Every commercial building permit with electrical scope — refreshed daily, filtered to the project type and value band you actually pursue.

EV

EV charging + service upgrade pipeline

Multi-family L2, fleet depots, retail DCFC, and commercial service-panel upgrades pulled from EV-specific permits and PUC interconnection filings.

Industrial

Data-center + industrial focus

Hyperscale fitouts, edge data centers, and life-science process loads tracked through dedicated industrial permits and IRP filings.

Entities

GC + owner graph

Every project ties to its GC, owner, architect, and electrical engineer — so you walk into the bid call already knowing the team.

Research

AI research matrix

Run questions like "which GCs in Dallas self-perform low-voltage" or "who's their typical fire-alarm partner" across an entire pursuit list.

Alerts

Rough-in stage alerts

Ping when a project hits foundation, then again at electrical rough-in, then at trim. The rhythm of when to call a GC for a follow-on bid or a change order.

Project types we cover

From a 200-amp service upgrade to a 40MW data-center fitout.

Tibly is built for private commercial electrical — where the team list is locked in early.

  • Healthcare — hospitals, MOBs, ASCs, dialysis
  • Data centers and edge compute fitouts
  • Multifamily and student housing
  • Restaurant and food-service TI
  • Retail and bank branch buildouts
  • EV charging infrastructure (L2, DCFC, fleet)
  • Industrial process loads — manufacturing, life sciences, cold storage
  • Education — K-12 and higher-ed electrical capital projects

Get a walkthrough on your bid territory.

30 minutes with a founder. We pull up your metros, filter to commercial electrical scope, and ship a workspace the same day if it's a fit.