Skip to main content

Flooring use case

Tibly for flooring contractors.

TI fit-outs, multifamily deliveries, and SFR closings — cued up for the finish-stage window when flooring scope is actually live. Stop calling GCs after the carpet is already laid.

Commercial flooring installation in a modern office tenant improvement with rolls of luxury vinyl plank, a crew laying engineered hardwood, and finished glass partition walls in the background
Why flooring teams switch

Hit the finish-stage window — every project, every metro.

What changes in the first month for a regional commercial + residential flooring shop.

Finish-stage alerts

TCO + finish inspection triggers across every metro

Multifamily turnover

Per-unit re-floor cycles surfaced

SFR closing pipeline

New-owner re-floor window in the first 60 days

What you get

Built for commercial install, multifamily turnover, and residential replacement.

Three pursuit modes in one workspace: commercial finish, MF unit turn, and SFR new-owner replacement.

Commercial

Commercial TI finish window

TI permit hits finish stage — the precise window where flooring scope goes out for bid. No more cold-quoting completed buildouts.

Turnover

Multifamily turnover pipeline

Per-unit turn cycles for multifamily portfolios surfaced from ownership data and capex permits — the highest-frequency repeat revenue funnel.

SFR

SFR closing alerts

Cross-reference ownership transfers with original flooring age. New buyers in their first 60 days re-floor at 4× the base rate.

Research

AI research matrix

Ask "what was the last flooring permit value" or "is the building LEED-certified" across an entire pursuit list — sourced citations.

Project types we cover

Commercial TI, multifamily turn, SFR replacement.

Tibly tracks every finish-stage permitable event and ownership transfer across the metros you serve.

  • Commercial TI flooring scope
  • Multifamily new-build delivery packages
  • Multifamily unit-turn repaint and re-floor
  • Healthcare and lab flooring systems
  • Retail and bank-branch buildouts
  • SFR closings with flooring-age signals
  • Industrial epoxy and resinous flooring
  • Insurance-restoration flooring repair

See your metro's finish-stage flooring pipeline.

30 minutes with a founder. We pull up your jurisdictions, split the feed by commercial vs MF vs SFR, and provision a workspace the same day if it's a fit.